The project includes construction of a 2.0MGD water treatment facility at the Ottawa Street site with coagulant feed system, filter aid feed system, water treatment units, chlorine feed system, finished water pumps, filter backwash system, process piping and appurtenances, below grade clearwell and CT tanks and instrumentation/controls, associated structural and architectural systems, site work, underground piping, site grading and access roads.
The project includes construction of a 2.0MGD water treatment facility at the Ottawa Street site with coagulant feed system, filter aid feed system, water treatment units, chlorine feed system, finished water pumps, filter backwash system, process piping and appurtenances, below grade clearwell and CT tanks and instrumentation/controls, associated structural and architectural systems, site work, underground piping, site grading and access roads.
The project includes construction of a 2.0MGD water treatment facility at the Ottawa Street site with coagulant feed system, filter aid feed system, water treatment units, chlorine feed system, finished water pumps, filter backwash system, process piping and appurtenances, below grade clearwell and CT tanks and instrumentation/controls, associated structural and architectural systems, site work, underground piping, site grading and access roads.
Construction of new concrete block/brick process building, Microfiltration system, UV Disinfection system, cleaning and demolition of existing sludge drying bed, demolition and relocation of existing sludge underflow pump station, new microfiltration wet well and pump station, replacement of existing standby generator and appurtenances, new alarms and instrumentation, new equalization tank (with pumping and blower equipment), earthwork, drainage systems, roadways, and yard piping.
Construction of new concrete block/brick process building, Microfiltration system, UV Disinfection system, cleaning and demolition of existing sludge drying bed, demolition and relocation of existing sludge underflow pump station, new microfiltration wet well and pump station, replacement of existing standby generator and appurtenances, new alarms and instrumentation, new equalization tank (with pumping and blower equipment), earthwork, drainage systems, roadways, and yard piping.
Construction of new influent building, Equalization Tank (including air line, pumps, piping, valves, and fittings), Aeration Tank, the entire RAS/WAS pumping system, Secondary Settling Tanks, Digester, and entire Post Aeration system.
The project includes construction of a 2.0MGD water treatment facility at the Ottawa Street site with coagulant feed system, filter aid feed system, water treatment units, chlorine feed system, finished water pumps, filter backwash system, process piping and appurtenances, below grade clearwell and CT tanks and instrumentation/controls, associated structural and architectural systems, site work, underground piping, site grading and access roads.
The project includes site work, excavation and backfill, complete balance tank, yard piping, concrete work, backwash piping, mechanical equipment for filter rooms, wading pool, chemical feed equipment, piping/valves/wall castings, filtration building, wood pavilions/additions, pool equipment/ladders/diving boards, fencing and gates, and stainless steel gutters.
The project includes clearing and grubbing, removal of substructures, canal structural concrete removal, structural excavation, cofferdams, staged cofferdams, concrete for structures, grouting existing voids, structural concrete, and galvanized nosing replacement.
The project includes clearing and grubbing, structure and trench excavations, temporary and safety sheet piling, footing and structure concrete, pre-engineered/pre-fabricated bow string truss pedestrian-bicycle bridge superstructure, and box beam guide railing assemblies.
The project includes sitework and restoration, yard piping, mechanical piping, appurtenances, junction structures, a new 120-ft secondary clarifier system including tank/sludge collection/scum removal equipment/weirs/baffles/access platforms/associated piping and valves, instrumentation, and electrical controls.
The project includes construction of a new water filtration plant, chemical facilities, 2400 square feet operations building, two earthen lagoons, with associated general construction, electrical, instrumentation, HVAC and plumbing work.
Construction of a 5.15 MGD water filtration plant including raw water wet well and pumps, chemical feed systems, two-stage pressure filters, CT tanks, a finished water pump, backwash water supply pumps, a backwash equalization pump, a recycle pump, a wastewater pump station, and a backwash equalization tank. Associated structural and architectural work, site work, underground piping, site grading, landscaping, and access roads are also included.


The project included all site work, yard piping, complete new treatment facility tanks and buildings, concrete work for tankage/buildings/miscellaneous structures, mechanical equipment and piping for all wastewater and sludge pumping and treatment, the entire screening/grit/flow measurement facilities, SBR systems with instrumentation, finishes, railings, and miscellaneous metals.
The project consists of four prime contracts for construction of Wastewater Treatment Facilities which include a pump station, force main, wastewater treatment plant and outfall pipe line. The project consists of the construction of Phase 1 of a new wastewater treatment plant with a nominal capacity of 0.50 million gallons per day.